Requests for Proposal/Qualifications

RFP

  • Procurement of High Voltage SF6 Breaker- Jeff L. Taylor Power Plant (.zip 1MB) – The purpose of this specification is to provide all technical features to design, furnish and deliver (one) outdoor,
    dead tank, SF6, power circuit breakers, 245 kV voltage class including all accessory equipment and material to replace the existing 245kV oil circuit breaker located in the outdoor switchyard at the Jeff L. Taylor Pine Flat Power Plant owned by Kings River Conservation District.  Proposals due:  February 12, 2026
  • Hydraulic model update with technical report and sediment removal plan  – KRCD is seeking technical proposals from highly qualified firms to update and enhance the hydraulic model and subsequent plans, reports, and assessments of the Kings River System from Pine Flat Dam to Mendota Pool (North Fork Kings) and Empire Weir No. 2 (South Fork Kings), including KRCD Flood Control Project Levees.  Proposals due: February 20, 2026

RFQ

  • General Counsel Legal Services (.pdf) – The Kings River Conservation District (KRCD) is soliciting qualifications from experienced law firms and attorneys to provide General Counsel Legal Services with a minimum of 7 years of experience representing public agencies.  Submission deadline: February 27, 2026